Quantcast
Channel: Exam Pundit - IBPS PO | Clerk | SBI PO | Insurance Exams | SSC Exams | Current Affairs
Viewing all articles
Browse latest Browse all 3589

Cloze Test Based on SBI PO Prelims 2017 Pattern

$
0
0



Hello and welcome to exampundit. Here is a Cloze Test based on the pattern in SBI PO Prelims 2017 first shift 29 April, 2017.

That is at the level of actual   involvement (1). But planning can and should run ahead of actual demand. This is vital, for example, to ensure that a     sufficient(2)     large part of the surface of a planned town’s future network (3)     is made up of roads, parks, playgrounds and other public spaces.
This will mean a detailed planning process in the periphery(4)   of a new town, such as Andhra Pradesh’s new capital Amaravati under construction right now, demarcating areas that cannot be taken  (5)   on or utilized for any purpose. Retrofitting vital infrastructure on a densely settled stretch of urban sprawl will be hugely expensive.

1. (a) work   (b) project       (c) construction (d) making       (e) no improvement required



2. (a)   huge (b)     decent (c)    sufficiently       (d)    remarkable   (e)    no improvement required




3. (a)  inclusion   (b) usage     (c)   method   (d) expansion    (e)   no improvement required




4. (a)     areas   (b)  boulevard  (c) neighborhood    (d)    shell      (e)  no improvement required



5. (a) considered    (b)   hampered       (c)    monitored  (d)   encroached  (e)  no improvement required







Answers:
1. (c)
2. (c)
3. (d)
4. (e)
5. (d)


Advertisement








Sponsored




Regards



Team ExamPundit


Viewing all articles
Browse latest Browse all 3589

Trending Articles